Featured Projects
Welcome to IPS! We take pride in our work and our ability to deliver lasting solutions.
Here, you can explore our completed projects and learn more about our approach to quality and durability.
FARGO, ND
membrane wtp & Improvements
Integrated Process Solutions, Inc. designed and built the control panels and Water Quality stations, based on engineers specs, modified Square D model 6 MCCs and provided instruments and start-up services for the $104 million, 15 MGD Membrane Water Treatment Plant expansion for the City of Fargo. In conjunction to the project numerous PLC modifications were also made to the existing 30 MGD Lime Softening plant to incorporate chemical storage and transfer, increase O3 production, and bring water monitoring up to future state compliance requirements. Start-up services included verification of all field signals, and configuration of all instruments and MCCs. Owners were provided with electronic parameter download files of all VFDs and Starters, and a database was created for asset management and service/calibration records for instruments and MCCs.
PLC: Allen Bradley ControlLogix; MCCs: Square D model 6, with Altivar 71 VFDs and TesysT starters; Instruments: Rosemount, ATI, Chemscan, Global Water, Sierra, S::can, Turner Design.
CONTRACT
Total Value: $3.03M
Completed: March 2019
TEAM
OWNER
City of Fargo
Fargo, ND 58102
Project Number: WA1301
ENGINEER
Advanced Engineering and Environmental Services, Inc
Fargo, ND 58104
Project Number: P00803-2009-25
GENERAL CONTRACTOR
Alberici Constructors Inc.
St. Louis MO 63114
ELECTRICIAN
JDP Electric, Inc.
Fargo, ND 58106-7097
SYSTEM INTEGRATOR
Integrated Process Solutions, Inc. (IPS)
34696 412th Street SE, PO Box 26
Fosston, MN 56542
218.435.1703
Project Number: 1185
grand forks, ND
water treatment plant
Integrated Process Solutions, Inc. designed and built the control panels and Water Quality stations based on engineer specs, modified Eaton Freedom 2100 MCCs, and provided instruments and start-up services for the new $153 million, 15 MGD Lime Softening/ Membrane Water Treatment Plant.
Start-up services included verification of all field signals, and configuration of all instruments and MCCs. Owners were provided with electronic parameter download files of all VFDs and Starters, configuration reports for instruments, and a database was created for asset management and service/calibration records for instruments and MCCs.
CONTRACT
Total Value: $3.4 million
Completed: November 2020
TEAM
OWNER
City of Grand Forks
Grand Forks, ND
City Project No. 7293
ENGINEER
Advanced Engineering and
Environmental Services, Inc. (AE2S)
Grand Forks, ND
Project Number: P00105-2007-006 040
GENERAL CONTRACTOR
Construction Engineers -
US, A Joint Venture
Grand Forks, ND
ELECTRICAL CONTRACTOR
Electrical Installation & Maintenance Co.
Fridley, MN
SYSTEM INTEGRATOR
Integrated Process Solutions, Inc. (IPS)
34696 412th Street SE, PO Box 26
Fosston, MN 56542
218.435.1703
Project Number: 1268
GuthRIE, ky
logan todd regional water commission
Integrated Process Solutions, Inc. was contracted by the Logan Todd Regional Water Commission to design, build, program, and implement a cellular telemetry system to replace the existing radio system that was installed in 2003. The existing radio telemetry system utilized serial radios, spread spectrum radios, and a combination of Allen Bradley Micro 1500 and SLC PLCs. The existing PLC’s were replaced with Allen Bradley CompactLogix 5069 series PLCs and Sierra cellular modems. In addition to the PLC and radio replacements, new Ethernet-based Operator Interface Panels (OIPs) were installed at 18 locations to replace the original Panelview 550 OIPs. Special design considerations were implemented to reduce data to be as cost effective as possible and minimize annual recurring costs. Remote sites included 23 water storage tanks, 14 Meter stations, 9 booster stations, and a Combined Sewer Outfall (CSO) station. The existing radio system was maintained and operated concurrently with the new cellular system while switching out all of facilities. IPS worked closely with LTRWC staff from design and planning to installation and implementation. IPS provided new system drawings and documentation for all sites, and provided Owner training to allow the Owner to remotely connect to any station over the cellular network.
LTRWC sells its water wholesale to thirteen member utilities who then sell it retail to many communities. Maintenance of transmission lines, tanks, pumps, metering stations, and the treatment plant contributes to the well being of over sixty thousand plus individuals.
PLCs: Allen Bradley ControlLogix; MCCs: Rockwell Automation; HMI SCADA: Ignition Perspective by Inductive Automation.
CONTRACT
Total Value: $997,000
Completed: September 2024
TEAM
OWNER
Logan Todd Regional Water Commission
Guthrie, KY 42234
ENGINEER
Integrated Process Solutions, Inc. (IPS)
34696 412th Street SE
PO Box 26
Fosston, MN 56542
www.ipsamerca.biz
218.435.1703
Project No. 2295
SYSTEM INTEGRATOR
Integrated Process Solutions, Inc. (IPS)
34696 412th Street SE
PO Box 26
Fosston, MN 56542
www.ipsamerca.biz
218.435.1703
Project No. 2295
PLC - Allen Bradley CompactLogix Operator Interface Panel - C-More Cellular Modems - Sierra Wireless
morgantown, WV
wastewater treatment plant
Integrated Process Solutions, Inc. provided nine new Motor Control Centers (MCCs), ten new Supervisory Control Centers (SCCs) with Compact Logix PLCs, active harmonic filtering equipment, large horsepower stand-alone VFDs, instrumentation, HVAC controls, ventilation monitoring, and local control stations for the Star City Wastewater Treatment Plant in Morgantown, West Virginia. A fiber optic network was utilized to connect all of the MCCs and SCCs in a redundant self-healing ring, and a separate gigabit fiber network was installed and used for cameras and plant-wide wifi.
PLCs: Allen Bradley CompactLogix; MCCs: Rockwell Automation; Gas Detection Equipment: MSA; Pressure, Level and Flow Instruments: Siemens; Ventilation Monitoring: Kobold.
CONTRACT
Total Value: $2.69 million
Completed: February 2021
TEAM
OWNER
Morgantown Utility Board
Morgantown, WV
ENGINEER
Strand Associates
Madison, WI
GENERAL CONTRACTOR
Ulliman Schutte Construction, LLC.
Miamisburg, OH
Job Number: 16010
SYSTEM INTEGRATOR
Integrated Process Solutions, Inc. (IPS)
34696 412th Street SE
PO Box 26
Fosston, MN 56542
www.ipsamerca.biz
218.435.1703
Project No. 1282
WAuSAU, WI
wastewater treatment plant
Integrated Process Solutions, Inc. provided five new Motor Control Centers (MCCs), ten new PLC control panels with Compact Logix PLCs, 36 stand-alone VFDs with harmonic filtering equipment, instrumentation, HVAC controls, ventilation monitoring, and local control stations for the City of Wausau Wastewater Treatment Plant in Wausau, Wisconsin. Dedicated network enclosures and a self-healing fiber optic network was utilized to connect all of the MCCs and PLCs in a redundant ring. Additionally, a separate gigabit fiber network was installed and used for cameras and plant-wide wifi.
PLCs: Allen Bradley CompactLogix; MCCs: Rockwell Automation; Gas Detection Equipment: MSA; Pressure, Level and Flow Instruments: E&H and Siemens; Anayltical: YSI.
CONTRACT
Total Value: $2.78 million
Completed: September 2022
TEAM
OWNER
City of Wausau
Wausau, WI
ENGINEER
Donohue & Associates
Sheboygan, WI
ELECTRICAL CONTRACTOR
Van Ert Electric Company
Wausau, WI 54401
GENERAL CONTRACTOR
Miron Construction
Wausau, WI
SYSTEM INTEGRATOR
Integrated Process Solutions, Inc. (IPS)
34696 412th Street SE
PO Box 26
Fosston, MN 56542
218.435.1703