top of page

Featured Projects

Welcome to IPS! We take pride in our work and our ability to deliver lasting solutions.

Here, you can explore our completed projects and learn more about our approach to quality and durability.

Fargo
FARGO, ND
membrane wtp & Improvements

Integrated Process Solutions, Inc. designed and built the control panels and Water Quality stations, based on engineers specs, modified Square D model 6 MCCs and provided instruments and start-up services for the $104 million, 15 MGD Membrane Water Treatment Plant expansion for the City of Fargo. In conjunction to the project numerous PLC modifications were also made to the existing 30 MGD Lime Softening plant to incorporate chemical storage and transfer, increase O3 production, and bring water monitoring up to future state compliance requirements. Start-up services included verification of all field signals, and configuration of all instruments and MCCs. Owners were provided with electronic parameter download files of all VFDs and Starters, and a database was created for asset management and service/calibration records for instruments and MCCs.

​PLC: Allen Bradley ControlLogix; MCCs: Square D model 6, with Altivar 71 VFDs and TesysT starters; Instruments: Rosemount, ATI, Chemscan, Global Water, Sierra, S::can, Turner Design.

CONTRACT

Total Value: $3.03M

Completed: March 2019

TEAM

OWNER

City of Fargo

Fargo, ND 58102
Project Number: WA1301

 

ENGINEER

Advanced Engineering and Environmental Services, Inc
Fargo, ND 58104

Project Number: P00803-2009-25

GENERAL CONTRACTOR

Alberici Constructors Inc.
St. Louis MO 63114

 

ELECTRICIAN

JDP Electric, Inc.
Fargo, ND 58106-7097

SYSTEM INTEGRATOR

Integrated Process Solutions, Inc. (IPS)

34696 412th Street SE, PO Box 26

Fosston, MN 56542

www.ipsamerca.biz

218.435.1703

ips@ipsamerica.biz

Project Number: 1185

Grand Forks
grand forks, ND
water treatment plant

Integrated Process Solutions, Inc. designed and built the control panels and Water Quality stations based on engineer specs, modified Eaton Freedom 2100 MCCs, and provided instruments and start-up services for the new $153 million, 15 MGD Lime Softening/ Membrane Water Treatment Plant.

 

Start-up services included verification of all field signals, and configuration of all instruments and MCCs. Owners were provided with electronic parameter download files of all VFDs and Starters, configuration reports for instruments, and a database was created for asset management and service/calibration records for instruments and MCCs.

 

CONTRACT

Total Value: $3.4 million

Completed: November 2020

TEAM

OWNER
City of Grand Forks

Grand Forks, ND
City Project No. 7293

ENGINEER

Advanced Engineering and

Environmental Services, Inc. (AE2S)
Grand Forks, ND
Project Number: P00105-2007-006 040

GENERAL CONTRACTOR

Construction Engineers -

US, A Joint Venture

Grand Forks, ND
 

ELECTRICAL CONTRACTOR
Electrical Installation & Maintenance Co.

Fridley, MN

SYSTEM INTEGRATOR

Integrated Process Solutions, Inc. (IPS)

34696 412th Street SE, PO Box 26

Fosston, MN 56542

www.ipsamerca.biz

218.435.1703

ips@ipsamerica.biz

Project Number: 1268

Logan Todd
GuthRIE, ky
logan todd regional water commission

Integrated Process Solutions, Inc. was contracted by the Logan Todd Regional Water Commission to design, build, program, and implement a cellular telemetry system to replace the existing radio system that was installed in 2003. The existing radio telemetry system utilized serial radios, spread spectrum radios, and a combination of Allen Bradley Micro 1500 and SLC PLCs. The existing PLC’s were replaced with Allen Bradley CompactLogix 5069 series PLCs and Sierra cellular modems. In addition to the PLC and radio replacements, new Ethernet-based Operator Interface Panels (OIPs) were installed at 18 locations to replace the original Panelview 550 OIPs. Special design considerations were implemented to reduce data to be as cost effective as possible and minimize annual recurring costs. Remote sites included 23 water storage tanks, 14 Meter stations, 9 booster stations, and a Combined Sewer Outfall (CSO) station. The existing radio system was maintained and operated concurrently with the new cellular system while switching out all of facilities. IPS worked closely with LTRWC staff from design and planning to installation and implementation. IPS provided new system drawings and documentation for all sites, and provided Owner training to allow the Owner to remotely connect to any station over the cellular network.

 

LTRWC sells its water wholesale to thirteen member utilities who then sell it retail to many communities. Maintenance of transmission lines, tanks, pumps, metering stations, and the treatment plant contributes to the well being of over sixty thousand plus individuals.

 

PLCs: Allen Bradley ControlLogix; MCCs: Rockwell Automation; HMI SCADA: Ignition Perspective by Inductive Automation.

 

CONTRACT

Total Value: $997,000

Completed: September 2024

TEAM

OWNER

Logan Todd Regional Water Commission
Guthrie, KY 42234

 

ENGINEER

Integrated Process Solutions, Inc. (IPS)

34696 412th Street SE

PO Box 26

Fosston, MN 56542

www.ipsamerca.biz
218.435.1703

ips@ipsamerica.biz

Project No. 2295

SYSTEM INTEGRATOR

Integrated Process Solutions, Inc. (IPS)

34696 412th Street SE

PO Box 26

Fosston, MN 56542

www.ipsamerca.biz
218.435.1703

ips@ipsamerica.biz

Project No. 2295

 

PLC - Allen Bradley CompactLogix Operator Interface Panel - C-More Cellular Modems - Sierra Wireless

Morgantown
morgantown, WV
wastewater treatment plant

Integrated Process Solutions, Inc. provided nine new Motor Control Centers (MCCs), ten new Supervisory Control Centers (SCCs) with Compact Logix PLCs, active harmonic filtering equipment, large horsepower stand-alone VFDs, instrumentation, HVAC controls, ventilation monitoring, and local control stations for the Star City Wastewater Treatment Plant in Morgantown, West Virginia. A fiber optic network was utilized to connect all of the MCCs and SCCs in a redundant self-healing ring, and a separate gigabit fiber network was installed and used for cameras and plant-wide wifi.

 

PLCs: Allen Bradley CompactLogix; MCCs: Rockwell Automation; Gas Detection Equipment: MSA; Pressure, Level and Flow Instruments: Siemens; Ventilation Monitoring: Kobold.

 

CONTRACT

Total Value: $2.69 million

Completed: February 2021

TEAM

OWNER

Morgantown Utility Board

Morgantown, WV 

ENGINEER

Strand Associates

Madison, WI

GENERAL CONTRACTOR

Ulliman Schutte Construction, LLC.
Miamisburg, OH

Job Number: 16010

SYSTEM INTEGRATOR

Integrated Process Solutions, Inc. (IPS)

34696 412th Street SE

PO Box 26

Fosston, MN 56542

www.ipsamerca.biz
218.435.1703

ips@ipsamerica.biz

Project No. 1282

WAuSAU, WI
wastewater treatment plant

Integrated Process Solutions, Inc. provided five new Motor Control Centers (MCCs), ten new PLC control panels with Compact Logix PLCs, 36 stand-alone VFDs with harmonic filtering equipment, instrumentation, HVAC controls, ventilation monitoring, and local control stations for the City of Wausau Wastewater Treatment Plant in Wausau, Wisconsin. Dedicated network enclosures and a self-healing fiber optic network was utilized to connect all of the MCCs and PLCs in a redundant ring. Additionally, a separate gigabit fiber network was installed and used for cameras and plant-wide wifi.

 

PLCs: Allen Bradley CompactLogix; MCCs: Rockwell Automation; Gas Detection Equipment: MSA; Pressure, Level and Flow Instruments: E&H and Siemens; Anayltical: YSI.

 

CONTRACT

Total Value: $2.78 million

Completed: September 2022

TEAM

OWNER

City of Wausau

Wausau, WI

ENGINEER

Donohue & Associates

Sheboygan, WI

ELECTRICAL CONTRACTOR

Van Ert Electric Company

Wausau, WI 54401​

GENERAL CONTRACTOR

Miron Construction
Wausau, WI

 

SYSTEM INTEGRATOR

Integrated Process Solutions, Inc. (IPS)

34696 412th Street SE

PO Box 26

Fosston, MN 56542

www.ipsamerca.biz

218.435.1703

ips@ipsamerica.biz

Wausa

Contact Us

Call or send us a message or email to connect.  We would love to have the opportunity to hear about your next project and explore how we can partner with you.

NATIONWIDE

IPS has partners across the country!

  • Offices in 3 states

  • Service Centers in 13 states

  • Licensed in 7 states

  • Projects in 15 states

IPS is ready to work with you!

Map

HQ OFFICE

34696 412th Street SE

PO Box 26

Fosston, MN 56542

​218.435.1703

MN OFFICE

ND OFFICE

411 Railroad Avenue

Main Level

Albany, MN 56307

320.345.1457

1600 47th Avenue South

Unit B

Grand Forks, ND 58201

218.791.2996

WI OFFICE

315 Raemisch Road

Suite D

Waunakee, WI 53597

608.849.4375

CONNECT

HOURS

SERVICE CENTERS

24 / 7 Emergency

Support

8a – 5p

Weekdays:

Big Lake, MN

Canton, SD

Clark, SD

Churchville, VA

Farmington, MN

Fosston, MN

Greenbush, MN

Kettering, OH

​Rexford, MT

​Stratford, WI

Titusville, PA

Waukesha, WI

West Bend, WI

Winona, MN

Woodbury, MN

© 2025 Integrated Process Solutions, Inc. All Rights Reserved.

Thanks for submitting!

bottom of page